Daytime load match
Size the array to your daytime base load. Exported power earns far less than the tariff you avoid, and some municipalities require zero export.
See how much your plant can save with solar, and how fast it pays back for farms, factories, warehouses, offices, Gauteng plants, office parks, shopping centres, plants and Gauteng businesses.
Solar saves money on every kWh your plant uses while the sun is up. Payback depends on how well your daytime load matches solar production, your tariff, the system cost and tax treatment. We calculate it for your specific plant from your own bills. If capital is a constraint, ask us about PPAs, leasing or purchase options.
Four factors determine your plant’s savings and payback:
Size the array to your daytime base load. Exported power earns far less than the tariff you avoid, and some municipalities require zero export.
On time-of-use tariffs (e.g. Eskom Megaflex, City Power TOU), solar offsets peak and standard-period energy. A battery can also cut demand (kVA) charges.
Roof type, mounting, inverters, storage and grid-connection work. Tax incentives for renewable energy may apply. Check the current rules with your tax adviser.
Larger annual tariff increases shorten payback. Panels lose a little output each year, and maintenance has a cost.
| Input | Example value |
|---|---|
| System size | Example: 200 kWp |
| Annual yield | Example: 200 kWp × 1,600 kWh/kWp = 320,000 kWh |
| Share self-consumed | Example: 95% → 304,000 kWh |
| Average avoided tariff | Example: R2.00/kWh |
| Year-1 saving | Example: ≈ R608,000 |
| Installed cost | Example: R2.4 m |
| Simple payback (no tax benefit, no escalation) | Example: ≈ 3.9 years |
Example figures only, to show the arithmetic. Your plant’s numbers will differ.
It depends mainly on daytime load match, tariff and system cost, so we calculate it for each plant from its own bills.
Not usually for savings alone. Batteries make sense for peak and demand-charge reduction or backup. See battery energy storage (BESS).
It depends on the municipality. City Power requires zero export until feed-in approval is in place, and Ekurhuleni requires a 4-quadrant meter. See SSEG applications.
A site assessment confirms usable roof area and structural capacity.
Send us your bills and tariff details and we will model your plant’s savings and payback.